Wildberries Data center Dubna
Industry:
Data-centers
Implementation period:
2025-2026
Object area:
The address:
Dubna
List of completed works:
Automation systems
Power supply systems
Security systems
Industrial automation (APCS)
Low-current system
Heating, ventilation and air conditioning (HVAC)
Briefly about the work performed
Controller brand:
OVEN PLC210-13-CS
SCADA brand:
MasterSCADA
Number of I\O points:
60000
Smart engineering systems:
Building automation
Low-voltage networks
Industrial automation
Ventilation and air conditioning
Power supply and lighting
Security systems
Brief description of the work performed:
ST Solution LLC performed the following scope of work:
- development of detailed design documentation for the Building Management and Dispatching System (BMS) and Structured Cabling System (SCS);
- installation of the electrical power supply system;
- installation of the Structured Cabling System (SCS);
- installation of the Building Management and Dispatching System (BMS);
- software development;
- development of the Test Program and Procedure;
- testing and commissioning.
Project participants:
Control cabinet manufacturer
Freetech